top of page


Data Centre, Slough
Data Centre, Slough
​
Main Contractor: Mercury Engineering
Value £375,000
​
Hillcroft installed the containment that was custom-designed as a solution to the specific needs and layout of the data centre environment and to cope with the size of the SWA cables that was being used.
This was a highly sensitive security site..
bottom of page