top of page
6.jpg

Data Centre, Slough
 

Data Centre, Slough

​

Main Contractor: Mercury Engineering

Value £375,000

​

Hillcroft installed the containment that was custom-designed as a solution to the specific needs and layout of the data centre environment and to cope with the size of the SWA cables that was being used.

This was a highly sensitive security site..

© 2024 by Hillcroft. Powered and secured by Wix

    bottom of page